Transit & Railway Projects

AMTRAK

Project Sunnyside Yard SFC Replacement
McKnight Solution
CPM Scheduling
Total Project Value
$45 Million

The Sunnyside Yard Static Frequency Converter (SFC) station is one of six frequency converter stations that comprise Amtrak's 25 Hz traction power system and is acknowledged as the second oldest SFC station currently in operation. This station is situated within Amtrak's Sunnyside Yard in Queens, New York. Designed in the mid-1990s, it commenced operations in 1998.
McKnight International implemented advanced computer systems to enhance time management and scheduling, contributing to 30% of the preliminary engineering documents and developing a comprehensive design-build (D-B) procurement package. Amtrak intends to utilize this package to solicit a D-B contractor to complete the design, furnishings, installations, testing, and commissioning of all pertinent equipment related to the project.

Transit & Railway Projects

Los Angeles County Metropolitan Transportation Authority

Project Metro Oversight For The Purple (D-Line) Extension Project
McKnight Solution
Performance Audit
Total Project Value
$3.2 Billion

The project involved the construction of twin bored tunnels, cross-passages, and walkways, along with three underground stations featuring ADA-compliant entrances. The project requires architectural finishes, mechanical and electrical systems, train control, traction power, communications, trackwork, and system tie-ins to the existing Purple Line. A retrieval shaft west of the Wilshire/Western Station is also necessary for tunnel boring machine extraction.
McKnight International conducted a performance audit of the Purple Line Extension project, evaluating Metro's project management practices. Our review focused on tunneling, station development, and system tie-ins; by identifying successes and areas for improvement, we aim to enhance efficiency, transparency, and risk mitigation in future transportation infrastructure projects.

Transit & Railway Projects

NJ Transit

Project On-Call Construction Management (CM) Services For Task Order Consultant Contracts Program
McKnight Solution
Construction Management
Total Project Value
$10 Million

NJ Transit implemented a Task Order Consultant Contracts Program to facilitate on-call Construction Management (CM) services for diverse projects, which included rail stations, maintenance facilities, rail bridges, and infrastructure enhancements. The construction manager may provide project control services such as Critical Path Method (CPM) scheduling, cost estimation, and auditing on a task-specific basis. McKnight International has been appointed by NJ Transit to deliver these on-call Construction Management services within the framework of the Task Order Consultant Contracts Program. This program is designed to support a wide array of critical infrastructure projects through a flexible, task-based methodology. This approach enables McKnight to offer customized solutions that effectively address the specific requirements of each project while upholding a consistent high standard of service across NJ Transit’s extensive portfolio. The contributions made by McKnight are anticipated to improve the safety, functionality, and longevity of NJ Transit’s rail and infrastructure assets.

Transit & Railway Projects

Southeastern Pennsylvania Transportation Authority (SEPTA)

Project Wayne Junction Station Rehabilitation
McKnight Solution
CPM Scheduling
Total Project Value
$35 Million

The Wayne Junction Station project focuses on restoring key features, including the station building and Germantown Headhouse, while refurbishing passenger tunnels and stairways. Key enhancements included the installation of an audiovisual public announcement system, updated signage, benches, new elevators, and ADA-compliant paths. McKnight International implemented advanced computer systems for time management and developed a detailed master project schedule, effectively sequencing construction to minimize disruptions. McKnight's use of Critical Path Method (CPM) scheduling has helped SEPTA preserve the historical integrity of Wayne Junction while modernizing the facility for improved efficiency and accessibility. This project showcases McKnight's commitment to high-quality CPM scheduling in complex transit projects.

BWI Airport

Restroom Improvement Renovations

CPM Scheduling

City of Philadelphia

Rebuild Phildadelphia

Project Management

Hanwha Philly Shipyard

Design-Build of a State-of-The-Art Modern Shipyard Facility

CPM Scheduling

CHOP

Morgan Center for Research & Innovation

CPM Scheduling

Silo Ridge Field Club

Field Club

CPM Scheduling

Partner With Us
  • 267-375-7565
  • info@mcknightintl.com
Linkedin-in Instagram Facebook-f
  • About Us
  • Industries
  • Aviation
  • Transportation
  • Transit
  • Capital Improvement
  • Commerical
  • Residential Development
  • Solutions
  • Cost Estimating
  • CPM Scheduling
  • Project Management
  • Project Inspections
  • Performance Audit
  • Portfolio
  • Careers
  • Contact Us
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}